Version 3 (modified by 14 years ago) (diff) | ,
---|
2011 Switch Upgrade
ISI
Existing Switches and their replacements.
Cisco4
Current Configuration
7x 48 port modules
Proposed Configuration
2x 5412zl chassis 2x quad cx4 modules 14x gigabit ethernet modules
Nortel10
Current Configuration
6x 5510-48T 1x 5530-24TFD
Proposed Configuration
2x 5412zl chassis 2x quad cx4 module 13x 24 port gigabit ethernet modules (7 in one chassis, 6 for the other)
Nortel18e
Current Configuration
7x 5510-48T 1x 5530-24TFD
Proposed Configuration
Two 5412zl chassis.
2 quad cx4 modules 15 24 port gigabit ethernet modules (8 for one chassis, 6 for the other).
New star switch
one cx4 card per experimental switch.
1 5400zl chassis 6 cx4 cards 1 x2 card for dragon