Version 2 (modified by jhickey, 13 years ago) (diff)

--

2011 Switch Upgrade

ISI

Existing Switches and their replacements.

Cisco4

Current Configuration

7 48 port modules

Proposed Configuration

Two 5412zl chassis 2 quad cx4 modules 14 gigabit ethernet modules

Nortel10

Current Configuration

6x 5510-48T 1x 5530-24TFD

Proposed Configuration

Two 5412zl chassis 2 quad cx4 module 13 24 port gigabit ethernet modules (7 in one chassis, 6 for the other)

Nortel18e

Current Configuration

7x 5510-48T 1x 5530-24TFD

Proposed Configuration

Two 5412zl chassis.

2 quad cx4 modules 15 24 port gigabit ethernet modules (8 for one chassis, 6 for the other).

New star switch

one cx4 card per experimental switch.

1 5400zl chassis 6 cx4 cards 1 x2 card for dragon