Changes between Version 1 and Version 2 of Internal/SwitchUpgrade


Ignore:
Timestamp:
Mar 28, 2011 6:37:00 PM (14 years ago)
Author:
jhickey
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Internal/SwitchUpgrade

    v1 v2  
    77=== Cisco4 ===
    88
     9==== Current Configuration ====
     10
     11 7 48 port modules
     12
     13==== Proposed Configuration ====
     14
     15  Two 5412zl chassis
     16  2 quad cx4 modules
     17  14 gigabit ethernet modules
    918
    1019=== Nortel10 ===
    1120
     21==== Current Configuration ====
     22 6x 5510-48T
     23 1x 5530-24TFD
     24
     25==== Proposed Configuration ====
     26 Two 5412zl chassis
     27 2 quad cx4 module
     28 13 24 port gigabit ethernet modules (7 in one chassis, 6 for the other)
     29
     30
    1231=== Nortel18e ===
     32
     33==== Current Configuration ====
     34 7x 5510-48T
     35 1x 5530-24TFD
     36
     37==== Proposed Configuration ====
     38 Two 5412zl chassis.
     39 
     40 2 quad cx4 modules
     41 15 24 port gigabit ethernet modules (8 for one chassis, 6 for the other).
     42
     43== New star switch ==
     44
     45one cx4 card per experimental switch.
     46
     47 1 5400zl chassis
     48 6 cx4 cards
     49 1 x2 card for dragon
     50