Changes between Version 2 and Version 3 of Installation/Switch


Ignore:
Timestamp:
Mar 17, 2011 10:02:02 PM (14 years ago)
Author:
jhickey
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Installation/Switch

    v2 v3  
    1111 * Router routes between the various networks.
    1212
     13We also have on the network:
     14 * HP 2810 Ethernet Switch Management Interface
     15 * Dell Remote Access Card for VMWare server
     16 * VMWare management interface
     17 * Power Controller (APC7902)
     18 * Serial Controller (IBM X330 + Obsolete Cyclades multi-port serial card)
     19
    1320
    1421
     
    2027|| 3      || Trunked port for the VMWare installation on the PowerEdge 2950 ||
    2128|| 4      || APC 7902 Power Controller ||
    22 || 5      || Serial Controller (IBM X330 + Obsolete Cyclades multi-port serial card) ||
     29|| 5      || Serial Controller ||
    2330|| 6-9    || Control Network ports for our testbed nodes ||
    2431