Changes between Version 4 and Version 5 of NewImpl


Ignore:
Timestamp:
Sep 16, 2013 10:00:41 AM (11 years ago)
Author:
faber
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NewImpl

    v4 v5  
    6161
    6262 * Access Control integrated with API calls
    63    * '''Milestone 23 Aug''' demonstrate access controlled calls to API
     63   * '''Milestone 5 Sept (~~23 Aug~~)''' demonstrate access controlled calls to API
    6464     * Subset of regression tests demonstrate access control in place
    6565 * Front end access to Experiments
    66    * '''Milestone 28 Aug''' Wiki documnetation of Emulab integration plan for meshing new interface to Emulab (matching DETER & Emulab users, reconciling Emulab Projects and DETER circles)
    67    * '''Milestone 30 Aug''' Wiki documentation of Specification of internal representation of experiment topology this is a spec of what we store and how for experiment topologies and how they become emulab/containers topologies.  For actions, data gathering, and constraints placeholder files will be used.  These will be expanded.
    68    * '''Milestone 6 Sept''' Working Experiment API calls that access saved but realistic experiment topologies and placeholder files on other axes.  Initial subset of regression tests.
     66   * '''Milestone 18 Sep (~~28 Aug~~)''' Wiki documnetation of Emulab integration plan for meshing new interface to Emulab (matching DETER & Emulab users, reconciling Emulab Projects and DETER circles)
     67   * '''Milestone 20 Sep (~~30 Aug~~)''' Wiki documentation of Specification of internal representation of experiment topology this is a spec of what we store and how for experiment topologies and how they become emulab/containers topologies.  For actions, data gathering, and constraints placeholder files will be used.  These will be expanded.
     68   * '''Milestone 1 Oct (~~6 Sept~~)''' Working Experiment API calls that access saved but realistic experiment topologies and placeholder files on other axes.  Initial subset of regression tests.
    6969
    7070 * Experiment Back-end
    71    * '''Milestone 11 Sept''' demonstrate connection of DETER users to Emulab users.  API creation of user on E-in-E results in correct creation of Emulab users and projects as outlined in the 28 Aug milestone.
    72    * '''Milestone 18 Sept''' can create physical node-only experiment from interface on e-in-e.
    73    * '''Milestone 27 Sept''' can create containerized experiment on e-in-e with virtual machines.
     71   * '''Milestone 4 Oct (~~11 Sep~~)''' demonstrate connection of DETER users to Emulab users.  API creation of user on E-in-E results in correct creation of Emulab users and projects as outlined in the 20 Sep ~~28 Aug~~ milestone.
     72   * '''Milestone 11 Oct (~~18 Sep~~)''' can create physical node-only experiment from interface on e-in-e.
     73   * '''Milestone 21 Oct (~~27 Sep~~)''' can create containerized experiment on e-in-e with virtual machines.