Changes between Version 10 and Version 11 of Installation/VM


Ignore:
Timestamp:
Aug 16, 2011 3:25:31 PM (13 years ago)
Author:
jhickey
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Installation/VM

    v10 v11  
    77There are three VMWare templates available at http://deterlab.net/~jjh/ for Boss, Users, and Router nodes.  These images don't contain the DETER source, but do have all packages required package to build the testbed source.
    88
    9 == A note about CPU ==
     9== A note about Virtual Machines and CPU core allocation ==
    1010
    1111The boss and users templates come configured to use 4 CPUs.  This is problematic on VMWare servers with less than 4 CPUs, since you can only give a VM up to as many cores as the ESXi host has.  If you are installing onto an ESXi host that has fewer than 4 CPUs, you will have to edit the number of allocated cores in the VM settings for boss and users before being able to boot them.