Version 5 (modified by jhickey, 14 years ago) (diff)

--

2011 Switch Upgrade

ISI

Existing Switches and their replacements.

Cisco4

Current Configuration

  • 7x 48 port modules

Proposed Configuration

  • 2x 5412zl chassis
  • 2x quad cx4 modules
  • 14x gigabit ethernet modules

Nortel10

Current Configuration

  • 6x 5510-48T
  • 1x 5530-24TFD

Proposed Configuration

  • 2x 5412zl chassis
  • 2x quad cx4 module
  • 13x 24 port gigabit ethernet modules (7 in one chassis, 6 for the other)

Nortel18e

Current Configuration

  • 7x 5510-48T
  • 1x 5530-24TFD

Proposed Configuration

  • 2x 5412zl chassis.
  • 2x quad cx4 modules
  • 15x 24 port gigabit ethernet modules (8 for one chassis, 6 for the other).

New star switch

one cx4 card per experimental switch.

  • 1x 5400zl chassis
  • 6x cx4 cards
  • 1x x2 card for dragon

Totals

  • 7x 5400zl chassis
  • 12x cx4 modules
  • 42x 24 port gigabit
  • 1x X2 module

HP Part Numbers