2011 Switch Upgrade
ISI
Existing Switches and their replacements.
Cisco4
Current Configuration
Proposed Configuration
- 2x 5412zl chassis
- 2x quad cx4 modules
- 14x gigabit ethernet modules
Nortel10
Current Configuration
- 6x 5510-48T
- 1x 5530-24TFD
Proposed Configuration
- 2x 5412zl chassis
- 2x quad cx4 module
- 13x 24 port gigabit ethernet modules (7 in one chassis, 6 for the other)
Nortel18e
Current Configuration
- 7x 5510-48T
- 1x 5530-24TFD
Proposed Configuration
- 2x 5412zl chassis.
- 2x quad cx4 modules
- 15x 24 port gigabit ethernet modules (8 for one chassis, 6 for the other).
New star switch
one cx4 card per experimental switch.
- 1x 5400zl chassis
- 6x cx4 cards
- 1x x2 card for dragon
Totals
- 7x 5400zl chassis
- 12x cx4 modules
- 42x 24 port gigabit
- 1x X2 module
Parts from HP
Descriptions and Links
- J8700A HP E5412-96G zl Switch
- J8702A HP 24-port 10/100/1000 PoE zl Module
- J8705A HP 20-port Gig-T / 4-port Mini-GBIC zl Module
- J8707A HP 4-port 10GbE X2 zl Module
- J8708A HP 4-port 10GbE CX4 zl Module
- J8437A HP 10GbE X2-SC LR Optic
- J8436A HP 10GbE X2-SC SR Optic (EOL?)