Changes between Version 2 and Version 3 of Installation/Site
- Timestamp:
- Oct 29, 2013 3:07:20 PM (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Installation/Site
v2 v3 1 == All wiring needs to be completed and checked before proceeding with the installation == 2 3 Your testbed must be fully wired before you attempt the software installation. This means all testbed nodes and IPMI interfaces are fully connected. It means that proper hardware has been purchased or sources. A poor foundation for your DETER installation will create problems down the line. We will be unable to diagnose basic wiring or setup problems remotely too. 4 1 5 == Public, Static IP addresses for Boss and Users == 2 6