Here is the list of classes along with their info for the next semester: * UCLA / [project:UCLAClass] * # students: 50 * # machines: Some assignments require 1 machine per student. At least one requires 4. Students do assignments individually. * # assignments: 5 * due dates: These dates aren't firm, but the plan is currently to have assignments due October 8, October 15, October 29, November 5, and November 12. * USC / [project:USCCSci530] * # students: 90 - 120 * # machines: 3-5 per assignment, depending on the assignment * # assignments: 3-4 substansive, 1 initial familiarization * due dates: substansive Oct - late Nov, initial mid-September * SMC / [project:SMC-CS78] * # students: 45 (capped and firm) * # machines 3-5 per assignment, depending on the assignment * # assignments: 3 substansive, 1 initial familiarization * due dates: Oct - late Dec, initial mid-late September * due dates are estimates, might end up juggled, advanced, or delayed * UC Berkeley * Vanderbilt University [project:VandyCS285] * When is class offered: Fall 2010 * Project name on DETER: VandyCS285 * Expected number of students: 15 * # Assignments: 2 * First assignment given: Nov 1 * Time to do the assignment: 16 days * Machines needed: 50 (at least 3 per student) * Second assignment given: Nov 18 * Time to do the assignment: 3 weeks * Machines needed: 80 (8 per group of 4 students) * Class ends: Dec 09. * Colorado State / [project:ColoState356] * When is class offered: Fall 2010 * Project name on DETER: ColoState356 * Expected number of students: 40 * # Assignments: 6, roughly every two weeks * First assignment given: late-august - this is a warm-up to get accounts and start using DETER * Time to do the assignment: 1 week * Machines needed: 40 (one per student) * Subsequent assignments given: roughly two weeks between assignments * Time to do the assignment: 2 weeks * Machines needed: 40 (3 per group of 3 students) * Class ends: December 17th * University of Portland * Youngstown State University / [project:YSU-secure] * # students: 50, two sections of 25 each (upper bound) * # machines: not sure yet * # assignments: one assignment to start but maybe another if the first one works out * # due dates: second week of November This was listed for USC but appears to be inaccurate: * USC * When is class offered: Fall 2010 * Project name on DETER: SMC-CS78 (already established) * Expected number of students: 25-40 * # Assignments: 2-4 * First assignment given: probably September * Time to do the assignment: 1 week * Machines needed: variable per assignment but more than one per student (3-5) so low/high estimates become 25x3=75 and 40x5=200 * Subsequent assignments given: spread over Oct-Dec20 * Time to do each assignment: 1 week * Class date range: 8/30/10-12/21/10